Bathroom fitting anywhere in London — free site visit, quote in 48 hours Mon–Sat, 8am–7pm · 07496 121213
HomeWhat we build › Bathroom fitting

Bathrooms and wet rooms

Full rip-out to final grout in two to three weeks. Tanked properly, tiled properly, and finished to a standard that still looks right in ten years.

£2mPublic liability insurance
10 yrStructural guarantee
48 hrWritten quote
0%Paid before we start

From £6,800 · typically 2–3 weeks

Waterproofing is the whole job

Most bathrooms that fail do so because of what is behind the tiles, not the tiles themselves. We tank wet areas with a proper liquid membrane system rather than relying on tile adhesive and grout, use cement board rather than plasterboard behind showers, and seal every junction before a single tile goes on. It adds a day to the programme and removes the problem that causes almost every bathroom callback.

Wet rooms

A wet room means the whole floor is the drainage plane, so the build-up matters. We form the fall in the screed or use a pre-formed tray, tank the floor and walls to at least 1.8m in the shower zone, and set the linear drain so water actually reaches it. On a suspended timber floor the joists usually need to be notched or a lowered deck formed, which we assess at the site visit.

What a bathroom job includes

Strip out and dispose of the old suite, alter waste and supply pipework to the new layout, electrics for lighting, shaver point, extractor and underfloor heating, plasterboard and cement board, tanking, floor and wall tiling, fit the suite, screen and shower, then silicone, decoration and clean.

Underfloor heating is worth the small extra cost on a bathroom — it is cheap to add during a refit and impossible to add afterwards without starting again.

Common questions

How much does a new bathroom cost?

A standard family bathroom refit typically starts around £6,800 for labour, tanking, tiling and installation, with the suite and tiles on top. A wet room usually adds £1,500 to £3,000 depending on the floor construction.

How long does it take?

Two to three weeks for a full bathroom. If it is your only bathroom, we can compress the disruption by pre-ordering everything so there are no waiting days mid-job.

Do you supply the suite and tiles?

You can buy your own, or we can supply. Most clients enjoy choosing their own tiles and let us supply the sanitaryware and shower — that way the parts that matter for reliability are ones we stand behind.

Will you fit an en-suite where there is no plumbing?

Yes, as long as there is a route for the waste. If gravity will not do it, a macerator or a pumped waste solves it. We work out the route at the site visit rather than discovering it halfway through.

Get a bathroom quote

Free site visit. Written price in 48 hours.

or send it straight to us

We use your details only to quote this job. No sales calls, and we never pass your number on. Privacy notice.

Bathroom past its best?

Send us your postcode and a photo of the room. We will come and price it properly, free, with the full specification in writing.